TULLOW OIL

Chacher Gas Field Development Project-30 MMSCFD

This project was awarded to SPEC in 2006 and was completed in 2007 for the Design, Detailed Engineering, Fabrication, and commissioning of one (1) skid mounted three-phase production separator & one (1) skid mounted test separator, one (1) 30 MMSCFD Amine Sweetening Facility, one (1) 30 MMSCFD TEG Dehydration Facility, Heat Medium Package, incinerator package, DCS system, chemical injection skids, Sour Water System, Instrument Air System, HP and LP Flare System, metering skid, one (1) water bath oil heater, crude oil stabilization column with internals and two (2) crude oil transfer pumps skids.

Client:
Tullow Oil

Location:
Pakistan

Completion:
2007

Services:
Engineering, Procurement, Construction, Commissioning

Business Portfolio:
Upstream Oil & Gas