GULF KEYSTONE

Provision of Permanent Drill Fluid Handling System

In December 2018, Gulf Keystone Petroleum entrusted SPEC with the Design Engineering, Project Management, Procurement, Fabrication, and Commissioning of Two (02) Trains of 10000 BOPD Permanent Drill Fluid Handling System at GKPI’s facilities PF1 and PF2 at their Shaikhan Block in Kurdistan Region of Iraq.

The following packages were supplied as part of the work scope:

Process Heater
3 Phase Separator
Water H2S Stripper Package
CPI Separator Package
Storage Tank Transfer Pump
Water Storage Tank
Water Transfer/Loading Pump
Unit PLC based Control System

Client:
Gulf Keystone Petroleum

Location:
Kurdistan, Iraq

Completion:
2020

Services:
Engineering, Procurement, Construction, Commissioning

Business Portfolio:
Upstream Oil & Gas